Custom House Plaza 

LOCATION: Plaza 3 / 2nd floor 
JOB DESCRIPTION 
This was an existing open plan office area on the second floor of the Customs House Plaza which we initially stripped out and installed temporary lighting and power to for the construction phase. The existing power distribution board was located in the centre of the open plan area, the new circuits were rewired back to two existing distribution boards located adjacent to the new office area where we install extra devices to take the new circuits. 
 
The fit-out phase consisted of the following: 
 
An open plan office layout comprising desks for 60no. workstations 
4 new offices and meeting rooms 
A new canteen area with a complete kitchen with cooking and food prep facilities 
Complete new lighting system consisting of LED Panel light fittings in a new ceiling grid throughout controlled by motion detectors 
Decorative pendent lighting and LED strip lighting in the canteen area 
Underfloor wiring for power and data to 30no. new floor boxes feeding open plan workstations the data cabling was CAT 6 cable wired back to a local comms room to a new cabinet which we supplied power to via a new UPS bypass panel. 
New fire alarm system which was rewired and refitted out and reconnected into the buildings existing fire alarm system 
A new security system consisting of access control wiring and cameras 
We wired and fitted new power circuits to the existing Fan Coil Units located in the open plan ceiling 
We tested the entire new wiring system and handed over the job on time complete with all certification and test results, updated distribution board charts and as installed drawings 